Plumbing Rough In That Passes Inspection the First Time

The rough in is the plumbing hidden inside walls and floors, and it has to be right before anything is closed up. Marin Plumbing installs plumbing rough in for new homes, additions, and accessory dwelling units across San Fernando and the San Fernando Valley.


Rough In Plumbing

The Foundation of Every Plumbing System

Rough in plumbing includes the underground drain lines, the drain and vent piping inside walls, and the water supply lines that will feed every fixture. Placement, slope, sizing, and venting all have to meet California plumbing code and match the fixture plan, because once drywall and flooring go in, mistakes are expensive to fix. Marin Plumbing works from your plans to lay out each fixture location, installs underground drains before the slab is poured, runs drain, waste, and vent lines and supply lines through the framing, and pressure tests everything for the rough plumbing inspection. We coordinate closely with your general contractor and other trades so the schedule stays on track. Builders and homeowners in San Fernando, Santa Clarita, and Northridge rely on us for clean, accurate rough in work.

✓ Underground drains before the slab pour

✓ Drain, waste, and vent piping

✓ Hot and cold supply lines to every fixture

✓ Pressure and water testing for inspection

✓ Coordination with your general contractor

Licensed and Insured

Black location pin icon with a circular center on a white background

San Fernando, CA


What Rough In Covers

Rough In Work We Handle

Rough in happens in stages as the building goes up. Each stage needs to be done in the right order and inspected before the next trade moves in.

Plumbing pipe icon

Underground Plumbing

Drain lines below the slab are set to grade and tested before concrete.

Water drop icon

Drain and Vent Lines

DWV piping is sized and sloped to drain freely and vent correctly.

Drain icon

Water Supply Lines

Hot and cold lines are run to every fixture and appliance location.

Faucet icon

Gas Piping

Gas lines are roughed in for ranges, water heaters, dryers, and fireplaces.

Water heater icon

Fixture Stub Outs

Stub outs are placed at the right heights for sinks, toilets, and showers.

Wrench icon

Inspection Testing

Every system is tested and ready for the rough plumbing inspection.

How Our Rough In Process Works

Rough in work runs on the construction schedule. We plan carefully so each stage is ready on time and passes inspection without delay.

01

Phone icon

Review

We review plans and fixture selections with you.

02

Shutoff valve icon

Layout

Fixture and line locations are marked on site.

03

Inspection icon

Underground

Below slab drains are installed and tested.

04

Written estimate icon

Top Out

Drain, vent, supply, and gas lines are run in the framing.

05

Repair wrench icon

Test

All systems are pressure tested for inspection.

06

Protection shield icon

Inspect

We meet the inspector and address any notes.

The rough in stage sets up everything that follows in a plumbing system. Good rough in work is invisible once the walls are closed, but it determines how well every fixture performs for decades. This guide explains what rough in includes and how to prepare. It is part of our new construction plumbing services, along with new home plumbing installation.

The Stages of Rough In

  1. Underground drains are placed and tested before the slab is poured.
  2. Framing is completed and fixture locations are confirmed.
  3. Drain, waste, and vent lines are run through the framing.
  4. Water supply and gas lines are installed.
  5. Every system is tested and inspected.
  6. Walls are insulated and closed after approval.

What to Decide Before Rough In

  • The model and location of every fixture
  • Shower valve types and showerhead heights
  • Water heater type and location, including tankless
  • Kitchen island sink or pot filler locations
  • Outdoor hose bibs and gas connections

Changes are cheapest before drywall

Moving a fixture during rough in is quick. Moving it after walls and tile are finished is costly. Confirm your layout early.

After Rough In

Once walls and finishes are complete, our new home plumbing installation service sets fixtures, connects appliances, and starts up the system. For remodels in existing homes, see kitchen remodel plumbing and bathroom remodel plumbing.

We rough in new construction for builders and homeowners in Santa Clarita, Northridge, and across the valley. Reach out through our contact form to discuss your project.

CA License #1154222


How it works

Accurate Work That Keeps Your Project Moving

A delayed or failed rough inspection can hold up every trade on the job. We build to the plans and to code, test before calling for inspection, and stay in close contact with your builder. If a design change happens mid project, we adjust quickly and keep everyone informed.

Marin Plumbing is licensed under California Plumbing Contractor License #1154222, with more than 20 years of hands on experience. If you are building a new home, addition, or ADU, reach out to plan your rough in.

Rough In for ADUs and Additions

Accessory dwelling units and room additions are common across the San Fernando Valley. They bring their own plumbing questions.

  • Whether the existing sewer lateral can handle the added load
  • How to tie new drains into the existing system
  • Whether the water service and meter are large enough
  • Separate water heater and gas service for the new unit
  • Code requirements for venting and cleanouts

We evaluate the existing system early in the project so there are no surprises later. That planning keeps your ADU or addition on budget and on schedule.

Do you pull plumbing permits?

We work under the project permit and coordinate all plumbing inspections.

Can you work from my architect's plans?

Yes. We build from your plans and flag any plumbing concerns early.

Working Smoothly With Builders and Other Trades

Rough in plumbing happens at the same stage as framing, electrical, and mechanical work, so coordination is just as important as the pipe itself. When trades plan together, drains clear joists, vents avoid ducts, and fixtures land exactly where the finished design shows them. When they do not, crews end up cutting framing or moving lines after inspection.

  • Review the plans and fixture schedule before any pipe is set
  • Confirm fixture models so valves and drains match their rough in sizes
  • Coordinate drain and vent routes with framing and duct runs
  • Protect pipes passing through studs with nail plates
  • Label stub outs and valves so finish crews know what they serve
  • Schedule inspections so walls can close without delays

Fixture selection drives rough in measurements. A wall hung toilet, a freestanding tub, a floating vanity, or a thermostatic shower valve each needs supply and drain locations that differ from standard fixtures. Knowing the exact models before rough in avoids moving pipes later, so we ask builders and homeowners to confirm choices early.

Drain lines need proper slope, and in tight floor systems that slope can conflict with beams and joists. We walk the framing before installing and flag conflicts so the builder can adjust with headers or blocking instead of notching structural members. Vent routing is planned to reach the roof without fighting ductwork or electrical runs.

Once the rough in is complete, we test the drain, waste, and vent system and the water supply lines, then meet the inspector on site. Clean, well documented rough in work keeps the schedule moving and makes finish plumbing quick and predictable for everyone involved.

Whether you are a homeowner adding a bathroom or a builder managing a full project, clear communication at this stage saves time, money, and frustration down the line.

Rough In for Additions and Accessory Dwelling Units

Rough in plumbing is not only for brand new homes. Room additions, garage conversions, and accessory dwelling units all need new drain, vent, and supply lines that tie into the existing system. These projects bring their own challenges, since new plumbing has to connect to older pipes that may sit in a slab or a crawl space.

  • Confirm the existing sewer line can handle the added fixtures
  • Check whether the water service and meter can supply the new demand
  • Plan drain routes through slabs or crawl spaces
  • Decide whether the unit needs its own water heater
  • Plan gas lines for ranges, dryers, or heating equipment
  • Coordinate inspections with the building department

Accessory dwelling units are especially common in Los Angeles County, and many need a separate water heater, a dedicated shutoff, and sometimes upgraded sewer or water service. We evaluate the existing system first so the rough in plan works with what is already there.

Careful planning at this stage keeps inspections smooth and prevents surprises when fixtures are installed later.

More From New Construction Plumbing

Plumbing Rough In is one of the services in our New Construction Plumbing category. The closest related service is New Home Plumbing Installation. Every job is handled by the same licensed team, with a written price before work begins.

You can also browse all of our services by category or reach out through our contact form.


Common questions

Frequently Asked Questions

Common questions about plumbing rough in for projects in San Fernando and the San Fernando Valley.

    What is the difference between rough in and finish plumbing?

    Rough in is the piping inside walls and floors installed before drywall. Finish plumbing is the installation of fixtures, faucets, and appliances after walls are complete.


    Do I need fixtures selected before rough in?

    Yes, ideally. Some fixtures, like wall mounted faucets and certain shower valves, need specific rough in heights and parts.


    Do you work with general contractors?

    Yes. We coordinate with builders and other trades to keep the schedule on track.


    Do you handle rough in for ADUs?

    Yes. We rough in accessory dwelling units, including new sewer and water connections.